N6IJ PRO-67C Yagi Installation
Pictures from Phase 1 - Saturday, Sept 3rd, 2004.
We'll meet at N6IJ again on Sunday, Sept. 12th (10 AM), to route cables and possible relocate the 3 el tri-bander to pole G.
Final Installation of the 67C on Pole C will be on Sunday Sept . 19th. (10 AM)
(Click on pictures to enlarge.)
|
Rick (a.k.a. 'The Locust'), K6VVA and Barry, K3KOA |
Garry, NI6T |
John Ittelson, K6JCI, and Howard K6IA |
Garry, NI6T hard at work. |
|
Chris, KG6DOZ |
President Kim, KD6TLB |
PRO-67C ready for test |
|
|
67C, Kim, Garry and Eric (WA6HHQ) |
67C 25 ft high with Bucket Truck SWR curves looks great on all bands! |
Chris, K6PIC, Tests out the N6IJ Bucket Truck |
|
|
Pole C to the left of the fence. (67C home.) |
Pole B with 40M inv Vee, 3 el Tri-Bander on temp tower and 4 el 20M Monobander on pole A. Pole C is 75 ft to the left (north) of the fence. |
Pole G - New home for 3 el Tri-Bander. |
Detail of pole mount on Pole G at 55 ft.. (Installed by Eric, WA6HHQ, on 9/4/04.) |
|
Sat Antennas. 144 and 432 crossed yagis. |
Crossed Sat. yagis with their new home, Pole L, between them and the discone. |
Pole L close up. The bucket truck can reach the top of this pole. |
New Layout map. Click to enlarge. |